Skip to main content

2025 Rate Study

A serene lake with surrounding hills under a clear blue sky.

On August 5, 2025, the LVMWD Board of Directors has scheduled a public hearing for October 9, 2025.

View the Notification of Public Hearing that LVMWD is distributing to customers. 

Water and Sewer Rate Study

The Las Virgenes Municipal Water District (LVMWD) has a Budget-Based Rate Structure, designed to encourage water-use efficiency and support long-term sustainability. This approach fairly allocates costs and promotes conservation. In 2020, the LVMWD Board adopted a five-year rate plan that developed rates in effect through 2025. Now, as the current rate structure reaches the end of its lifecycle, the LVMWD Board of Directors is preparing to consider new adjustments, once again in accordance with Proposition 218. To guide this important process, the Board has adopted a set of Rate Study Policy Principles:

Policy Principles

  • Maintain a rate structure that is fair and equitable across customer classes and maintain commercial water budgets that promote efficient use in a manner that supports business and economic development.
  • Maximize revenue stability to navigate variable economic and hydrologic conditions.
  • Provide a strong price signal to drive an efficiency ethic and minimize rate impacts to efficient customers.
  • Ensure that rates are compliant with California Law.
  • Propose rates that allow the District to meet a minimum debt-service coverage ratio of 1.50.

What Drives Rates?

LVMWD partnered with Water Resources Economics (WRE), a leading rate consulting firm, to analyze the District’s financial needs and develop a roadmap for sustainable service delivery. Several key factors influence how water and sewer rates are set:

  • Diversification of Water Supply
    • Imported Water Costs - LVMWD currently relies entirely on imported water purchased from the Metropolitan Water District of Southern California. Rising wholesale water rates directly impact what we pay to deliver water to our community.
    • Development of New, Dependable Water Sources
      • Pure Water Project - Maximizing the beneficial reuse of our high quality recycled water, this project will purify this water using advanced treatment technologies to create our first local and sustainable source of water that will account up to 30% of our drinking water needs.
  • Service Reliability
    • Climate Change - Water scarcity and extreme weather make long-term planning essential. Much of California’s water must be transported from distant sources like the Bay-Delta and the Colorado River, requiring costly infrastructure that must be maintained, upgraded, or expanded to withstand climate-related challenges.
    • Capital Investments - Aging infrastructure—like pipelines, pump stations, and treatment facilities—must be repaired or replaced through our Capital Improvement Program to ensure the reliability and safety of our water and sewer systems.
    • Operating Costs - Electricity, chemicals, replacement parts, and construction services all play a role in delivering water and sanitation services. Like everything else, these costs rise over time and must be factored into rate planning.
  • Regulatory Compliance
    • Environmental Compliance - As stewards of the Malibu Creek Watershed and the Santa Monica Mountains, the District must meet strict environmental regulations. This includes ongoing costs for monitoring, reporting, and capital improvements to protect our sensitive ecosystems.
    • Evolving Treatment Requirements and Regulations - Rapidly changing treatment requirements and the emergence of new regulations surrounding both drinking water and waste water treatment must be accounted when developing our rates.

About the Rate Study

Setting new rates is a complex, multi-phase process. The goal is to ensure the District can continue providing safe, reliable, and environmentally responsible water and sanitation services for years to come.

As the rate study progresses, this page will serve as your go-to resource for updates, reports, and public meeting information. We encourage all customers to stay informed and engaged.

Frequently Asked Questions 2025.pdf
Revenue Needs Analysis 

The first step in the Rate Study is to determine the District’s revenue needs for the next five years based on projected costs and the factors noted above. On February 18, 2025, the results of the future revenue needs was presented to the LVMWD Board, which can be found below.

February 18, 2025, Board Meeting

Cost of Service Analysis 

The next step in the Rate Study is to develop draft rates for the next five-year period based on a cost of service analysis. The results of this Rate Study were presented to the Board on June 17, 2025, which can be found below.

June 17, 2025, Board Meeting

Proposed Rates 
A table showing water rates from 2026 to 2030, including charges for readiness, commodity, elevation, and private fire lines.
Charges and rates for recycled water from 2026-2030, including readiness, commodity, and elevation charges.
Sanitation rate table for residential and commercial charges from current to 2030, showing increases over time.
Rate Calculator 
Public Workshops 

There are two pubic workshops scheduled to answer customer questions regarding the proposed rate changes.

Tuesday, August 19, 2025, at 6 p.m. 
Attend live at LVMWD HQ and virtually via zoom:
https://lvmwd.zoomgov.com/j/1617094399

Tuesday, August 26, 2025, at 6 p.m.
Attend virtually via zoom:
https://lvmwd.zoomgov.com/j/1617094399

Public Hearing 

Public Hearing on Proposed Rate Changes

October 9, 2025, at 9 a.m.

Attend in person at LVMWD HQ or virtually via zoom:
https://lvmwd.zoomgov.com/j/1610876866