Engineering and Facilities

Welcome to the Engineering and Facilities page for Las Virgenes Municipal Water District. Here, you’ll find information on the planning, design, and upkeep of essential infrastructure that keeps our water and sanitation services reliable and resilient.
Our Engineering and Facilities teams work tirelessly to ensure that every project meets the highest standards of quality, safety, and efficiency. From managing major infrastructure upgrades to conducting regular maintenance on our treatment plants, pipelines, and pumping stations, our focus is on delivering dependable, sustainable water solutions that serve our community’s needs both today and for future generations.
Explore the sections below to learn more about our current projects, long-term planning, and commitment to creating a resilient water system that supports our community’s well-being and environmental health.

(Planning/Engineering)
This is where you will find instructions on how to request utilities research, design standards, easements, master plans and capacity fees.
Should you still have questions, please email Albert Silva at ASilva@LVMWD.com or Steven Cano at SCano@LVMWD.com
If you need assistance in-person from the Technical Services staff, appointments are strongly recommended to ensure the appropriate LVMWD staff member is available to meet your needs. Visit the link below to make an appointment.
Learn more about the services we provide below.

Please contact LVMWD Technical Services at (818) 252-2100 for the latest design standards.

In order to provide the final approval for water system construction plans and/or installation of water facilities not located in the public right-of-way, Las Virgenes Municipal Water District requires private land owners/developers to dedicate required easements to LVMWD for access, operation and maintenance of dedicated water facilities.
Should you still have questions, please email Albert Silva at ASilva@LVMWD.com or Steven Cano at SCano@LVMWD.com
Customer Easement Requirements/InstructionsEasement Title Page
For Public Review August 15, 2024 - September 16, 2024
Notice of Intent to Adopt a Mitigated Negative Declaration (PDF)Tapia Water Reclamation Facility 003 Outfall Rehabilitation IS-MND (PDF)Engineering Documents
Urban Water Management Plans, linked below
Infrastructure Investment PlanLVMWD 2019 Hazard Mitigation PlanSolar Generation Project Phase II, linked below
Master Plans
Summer Flow Augmentation CEQA Initial StudyDeerlake Ranch, Chatsworth Tract No. 53138Twin Lakes Water Tank and Pump Station Upgrades MND - November 2020Draft Additional Environmental Information Deerlake Ranch TTM No. 53138Modified Restatement of Certification of EIRDEIR Technical AppendicesDeerlake Approved Sewer Area StudyFH Location on Approved Tentative Map 05/03/16Tentative Tract Map 07/22/15 SubmittalTechnical Memo Deerlake Ranch Demand Analysis – FinalDeerlake Storage and Pumping StudyFinal Tentative Tract 53138Potable Water Master Plan 2014Recycled Water Seasonal Storage Feasibility Study June 2012 2014 Recycled Water Master Plan2014 Integrated Master Plan2014 Sanitation Master Plan
Below are links to different types of letters requesting utility research for new construction, possible water or sewer line connections. If you are an architect, engineer, contractor or the homeowner, please review the utilities research instructions.
Utilities Research InstructionsShould you still have questions, please email Albert Silva at ASilva@LVMWD.com or Steven Cano at SCano@LVMWD.com
Request Format Examples:
Example AExample BExample CExample D