5-Mil Tank Open House
5-Mil Open House (2015)
Updated on 04/22/2016 2:24 PM
The completion of the 5-mil tank was held on Saturday, November 14. Guests took tours of the filtration plant, walked across the main dam, and then across the saddle dam to get a close up view of the 5-million gallon tank. Complimentary hot dogs and beverages were provided.

Welcome Galley

Welcome Galley

Welcome Galley

Welcome Galley

Welcome Galley

Tour of filtration plant with GM Pedersen

Tour of filtration plant

Tour of filtration plant

Tour of filtration plant

Tour of filtration plant

View from the filtration building to the outside

David Lippman, Dave Pedersen, and Don Patterson

MWD / LVMWD Director Peterson and Calleguas Director Scott Quady

LVMWD Van at shuttle stop

LVMWD Van at shuttle stop

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

#LVMWD5Mil

Mean Streets Hot Dog served up a great lunch

Mean Streets Hot Dog served up a great lunch

Mean Streets Hot Dog served up a great lunch

Mean Streets Hot Dog served up a great lunch

Overview of Mean Streets Hot Dogs

Mean Street Dogs

Time Lapse Video of construction of the 5-Mil Tank

Viewing the time lapse video

Viewing the time lapse video

Touring the 5-mil tank

Touring the 5-mil tank

Touring the 5-mil tank

Touring the 5-mil tank

Touring the 5-mil tank

Touring the 5-mil tank

The oak trees at the tank

The 5-million gallon tank

Looking down the pipeline to the tank

The main dam

Walking the main dam and viewing pump station below

Walking the main dam

View of the filtration plant from the saddle dam

View of the filtration plant from the tank

View of the 5-mil tank from the other side of the reservoir

The main dam

The main dam

Las Virgenes Reservoir

Las Virgenes Reservoir

District Staff at the end of a successful event































































Set up - 5-Mil Tank Open House is ready for its first guests.

Set up - 5-Mil Tank Open House is ready for its first guests.

Set up - 5-Mil Tank Open House is ready for its first guests.

Set up - These are the different color choices for the tank.

Set up - Director Caspary, John Zhao and Tom Blake are ready for questions.

Reservoir Tank Location - The Las Virgenes Reservoir and the tank location (marked with an orange traffic cone).

Guests Station 1 - Residents stop at Station 1 to find out more about the project.

Guests Station 1 - Residents stop at Station 1 to find out more about the project.

Station 2 - John Coffman from AECom and Tom Blake from Fugro Consultants await their first guest at Station 2

Welcome - Karen Snyder and Joan Isaacson, Katz & Associates, welcome guests.

Welcome - Guests arrive at the Welcome Station before moving forward.

My House Is Where - Residents looking out towards Westlake and Three Springs.

Director Polan GM Pedersen - Director Polan and General Manager Dave Pedersen engaging with local residents.

Schedule Traffic - Shirley & Michael Richards talking about potential traffic with Jeff Reinhardt.

Director Caspary - Director Caspary speaks with a local resident about the project.

Welcome - More residents stop at the Welcome Station.

Welcome - More residents stop at the Welcome Station.

GMPedersen - General Manager Dave Pedersen (center) speaks with local residents.

Views - Checking out what the tank will look like from their home in photo renditions.

Landscaping - Landscape consultant Bob Bombardier speaks with a local resident about the preliminary landscaping plans.

Excavating Blasting - General Manager, Dave Pedersen, listens while Tom Blake explains the excavating and blasting.

GMPedersen Linda Parks - General Manager Dave Pedersen and Supervisor Linda Parks discuss the project.

Station 2 - Local residents chat with consultants.

Director Caspary - Director Caspary chats with residents.

Director Steinhardt GM Parks - Director Steinhardt greets Supervisor Linda Parks.

Conversation Groups - Residents speak with consultants at different stations.

Landscape Views - Landscape consultant Bob Bombardier discusses landscape views with a resident.

GM Steinhardt - Dave Pedersen and Director Steinhardt

Welcome - More residents continue to arrive.

Filtration Plant - LVMWD's Steve Jackson, gives an overview of the filter system.

Filtration Plant - Local resident reviews how the water is delivered.

Director Steinhardt - Director Steinhardt speaks with local residents about the project.

Traffic Excavation - Resident reviewing the Traffic and Excavation poster.

Director Renger Station 2 - Director and Mrs. Renger discussing the project with Brandon Hale from AECOM

Conversation Ticktin - Local resident Neil Ticktin discussing the project with other residents, LVMWD staff and LVMWD Director Caspary.


































