Corral Canyon - Malibu Bowl Project

Pipeline Replacement - Fairside Rd and Ingleside Way
This project will improve service reliability. LVMWD will install a new section of pipeline on Fairside Road and Ingleside Way.
(Update November 1, 2012)
Preliminary work will include pot-holing to determine the best routing for the new pipeline.
It will then be necessary to dig a trench for installing the new line. Water service may be interrupted from time to time. Whenever possible, notice will be give prior to service interruptions. After the pipeline is installed, pavement will be restored to its original contour.
During construction, please be sure your pets are in a secure location.
Sign up for e-Notification to receive timely updates about construction projects and more.